Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 10 Years |
Still deciding? Get samples of US$ 6669/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Power
|
20KW
|
Blade length
|
3.8 meters
|
material of the blades
|
Fiberglass-Reinforced Plastic
|
rated rotor speed
|
100r/min
|
rated speed
|
10m/s
|
rated Power
|
20KW
|
output voltage
|
220V/240V/380V
|
start up wind speed
|
4(m/s)
|
work speed
|
4-20(m/s)
|
security wind speed
|
40(m/s)
|
height of guy cable tower
|
30m
|
generator style
|
3-phase AC PM
|
top quality except tower
|
650.0kg
|
1. What kind of region can be installed wind turbine?
Small wind turbines should be applied in the regions which wind resources is sufficient. The annual average wind speed should be
more than 3m/s, the effective wind speed 3-20m/s should be more than 3000h in accumulation per year. The density of 3-20m/s
effectively average wind power should be more than 100W/m2.
It should be noted that choosing the rated design speed wind turbine is in conformity with local design speed. It is significantly
in making use of wind resources and in economic aspect. Wind tunnel test proves that the fan power transformation of the impeller
in the direct ratio with wind speed, that is to say, the wind speed decide the output electrical power.
2. How to calculate the actual need power in my home to configure the appropriate power of wind turbines?
At present, battery stores the power from the wind turbine, then discharge to home appliances. So the power which discharged to
the load and be charged timely by wind turbine is the amount of the actual needs power.
Take an example: the rated output power from wind turbine generator is 100W per hour, the continuous workable hours by wind is 4
hours. The battery can be charged total capacity is 400WH. For only about 70% power from battery can be discharged to the load, so
the actual power which can be used from battery is 280WH.
If there are:
1) Bulb15W x 2 Pieces, working 4 hours one day, consumption 120WH
2) TV 35W x 1 set, working 3 hours one day, consumption 105WH
3) Radio 15W x 1 Piece, working 4 hours one day, consumption 60WH
Above total consumption is 285WH per day. If you
only design to install 100W wind turbine generator, the consumption total power
will more than the power from wind turbine generator. In long period of time using power from 100W wind turbine generator, it will
make the battery serious loss of electricity and damaged, and it will cut down your battery service life.
It is assumed that wind turbine at rated wind power generation and energy consumption, but in fact, due to the variability of the
wind, intermittent, there are strong and weak wind different (wind speed) and wind blow in long time and short time
different(frequency). So you should cut down even cut off some electrical application working time when the wind condition is in
poor to protect your battery. If your budget is enough, it will be better to install a diesel generator set or install solar
panels at the same time.
3. How to select the correct battery capacity to get power from wind turbine generator?
Generally, the battery capacity should be equal or smaller than the power from wind turbine generator.
1) 100W wind turbine generator matches 120AH battery (60AH x 2 Pieces)
2) 200W wind turbine generator matches 120-180AH battery (60 OR 90AH x 2 Pieces)
3) 300W wind turbine generator matches 240AH battery (120AH x 2 Pieces)
4) 750W wind turbine generator matches 240AH battery (120AH x 2 Pieces)
5) 1000W wind turbine generator matches 360AH battery (60AH x 3 Pieces)